Home Page Everything what you would like to now about us How to find us Product range nad details Technical specification Aftercare info
gl

General maintance and aftercare instructions for all products:

The following maintenance instructions provide the basis for a minimum level of care, inspections should be carried out on a regular basis to the recommendations listed, and any necessary rectification effected between these intervals, when necessary.

Finish

 
Every 3 months

Clean all anodized aluminium with warm water and mild detergent.

Every 4 months

Clean all polyester powder coated aluminium with warm water and mild detergent.

 

NOTE: In aggressive environments cleaning should be more frequent. Also where heavy soiling has occurred from lack of cleaning maintance White Spirit can be used, after which must be thoroughly washed off. Under NO circumstances should any harse abrasives or alcohols be used.

Hardware

 
Every 12 months Check retention, lubrication, tension and operation of all fittings, balances, locks and accessories. Where necessary, carrying out any adjustment, re-tensioning and lubrication to the suppliers recommendations

Seals

 
Every 12 months

Check all weatherstrips and gaskets for damage, shrinkage and distortion, replace where necessary.

Sealants  
Every 12 months Check all sealants applied to the joints and fixings including those on adaptor interfaces. Where damaged, or failure has been found, care must be taken when replacing to ensure aesthetic appearance of the product is not adversely affected.
Damage  
Every 12 months

Check all aspects of the product for damage and where practicable the effected parts should be replaced.

Should you require any further information please do not hesitate to contactMick Fox.

gl
gl
| Ali Systems Limited | Unit 2 | Barford Industrial Estate | Watton Road| Barford | Norwich | NR9 4BG|
| T: 01603 757710 | F: 01603 757711 |office@alisystems.co.uk